Power stations

Britain’s large power stations, unit by unit: what each is generating now, what’s holding output back, and the reasons operators have published — read at one shared moment across every fuel.

The nuclear fleet right now

Physical notifications and export limits
⚠ This is expected output, so it won’t match the Generation page to the megawatt. Each unit’s figure is the lower of what it notified and its export limit for this half hour. The nuclear total on the Generation page is measured output every five minutes.

Stations

Output by station and reactor, against registered capacity

Outages and limits

Every reactor that isn’t at full output, with the reason its operator published
UnitStatusReasonOutput MWExport limit MWRegistered MWExpected back

Reasons and return dates come from each reactor’s latest active REMIT unavailability message.

Fleet outlook

Four of the five stations are expected to stop generating by March 2030
StationTypeRegistered MWExpected to generate until

Hinkley Point C

Under construction in Somerset · not generating yet
Today · under construction
When complete · as planned
Planned capacity
3,260MW
Two EPR units · 2 × 1,630 MW
That would be
–
of today’s registered nuclear fleet
First power
2030
EDF, February 2026: Unit 1 expected to start generating

Expected output, not meter readings.

About these figures

Notified and delivered · registered capacity · not shown

How it works

These figures are expected output, not meter readings. Each reactor tells the system operator every half hour what it expects to generate (its physical notification) and the most it can export (its maximum export limit), and this page shows the lower of the two for the current half hour.

Notified and delivered can differ

A notification can run ahead of what a reactor delivers. On 16 September 2026 Heysham 2 Reactor 7 notified 640 MW with a 545 MW export limit, and EDF reported 554 MW: taking the lower figure gets much closer. Metered output for each unit arrives days later.

Registered capacity isn’t how much a reactor can make today

Bars measure against each unit’s registered generation capacity, which is fixed in the registration data. Ageing AGRs routinely run below it, so a reactor at 85% of registered capacity can still be at its normal full load.

Not shown on this page

It doesn’t show metered output, fuel, or why an operator chose a level beyond what its outage messages say. Stations outside the balancing mechanism don’t appear. The illustrations are stylised, not survey-accurate.

More in the methodology: expected output at each power station →

Sources: physical notifications, export limits and registered capacities are Elexon Insights Solution data for each nuclear BM unit. Outage reasons: REMIT unavailability messages. Measured nuclear output: FUELINST.